广告

橡胶跑道片材挤出机_橡胶跑道生产线_片材挤出机厂家

  • 图片0
  • 图片1
  • 图片2
1/3
新浪微博
QQ空间
豆瓣网
百度新首页
取消

橡胶跑道片材挤出机
1.橡胶标准跑道全长为400米,应由两个平行的直道和两个半径相等的弯道组成。除 塑胶跑道草地跑道外,跑道内侧应用适宜材料制成的突沿加以分界。突沿高约5厘米,宽至少5厘米。
2.应在跑道内突沿外沿以外30厘米处测量跑道长度。如无突沿应在标志线外沿以外20厘米处进行测量。注:《国际田联的田径场地设施手册》含有全部有关跑道结构、设计、标记的技术信息。本规则给出了应该遵循的基本原则。
3.400米及400米以下各项径赛,每名运动员应占有一条分道,分道宽小为1.22米,大为1.25米,分道线宽5厘米,所有分道宽应相同。应按上述第2款的规定测量分道的长度,其他分道的长度应在内侧分道线外沿以外20厘米处进行测量。
注:分道宽应包括右侧分道线
橡胶跑道施工在 沥青或水泥基础上,基础做法与道路施工大致相同。基础表面平整度要求较高,以塑胶面层厚度一致,弹性均匀,对基础的质量要求如下:
坡度:横向<1%(弯道8‰、直道5‰、半圆区5‰),纵向<1‰,跳高区<0.4%,表面应平坦光滑、排水畅通。
平整度:平整度合格率在95%以上,3米直尺误差3mm。
定位: 为准确施工及画线需要,应用牢固鲜明标志物标出跑道场地的四个半圆切线点和两个圆心。
排水:排水系统在大雨后二小时必需排出积水。在冰冻地区,沥青层与碎石层之间好加一层土工布缓冲层。沿排水沟槽的基础应做特殊防水处理。
强度和稳定性:基础应具有一定的强度和稳定性,表面均匀坚实、无裂缝,无烂边,接缝平直光滑。垫层压实,密实度大于95%,在中型碾压机压过后,无显著轮迹、浮土松散、波浪等现象。
Rubber track sheet extruder
1. The rubber standard runway is 400 meters in length and should consist of two parallel straights and two curves with equal radius.In addition to the plastic runway grass runway, the inside of the runway is separated by a suitable material edge.The border is about 5 cm high and at least 5 cm wide.
2. The length of the runway shall be measured 30 cm away from the outer edge of the inner edge of the runway.If there is no protrusion, the measurement should be carried out 20 cm away from the outer edge of the mark line.Note: the iaaf manual of track and field facilities contains all technical information about the structure, design and marking of the runway.This rule gives the basic principles that should be followed.
Each athlete shall have a lane with a width of 1.22 meters, a width of 1.25 meters, a width of 5 centimeters, and all lane widths shall be the same.The length of the first lane shall be measured in accordance with the provisions of paragraph 2 above, and the length of the other lane shall be measured 20 cm away from the outside of the inner lane divider.
Note: the lane width should include the right lane
The rubber runway is built on asphalt or cement, and the basic method is the same as the road construction.The requirements for the surface flatness of the foundation are high, so as to ensure the thickness of the plastic surface layer is consistent and the elasticity is even. The quality requirements for the foundation are as follows:
Slope: horizontal <1%(8‰ of bend road, 5‰ of straight road, 5‰ of half circle area), vertical <1‰, jumping area <0.4%, smooth surface and smooth drainage.
Flatness: the flatness pass rate is more than 95%, and the error of 3m ruler is 3mm.
Positioning: in order to accurately construct and draw lines, four semicircle tangent points and two centers of the runway site are marked with solid and bright markers.
Drainage: the drainage system must drain water two hours after heavy rain.In the frozen area, a layer of geotextile buffer is added between asphalt layer and gravel layer.The foundation along the drain groove should be treated with special waterproof treatment.
Strength and stability: the foundation shall have certain strength and stability, with uniform and solid surface, no cracks, no rotting edges, and smooth joints.The cushion is compacted, and the compactness is more than 95%. There is no obvious wheel track, loose floating soil, wave and other phenomena after the compaction of medium roller.

仿大理石挤出机玖德隆机械(昆山)有限公司为你提供的“橡胶跑道片材挤出机_橡胶跑道生产线_片材挤出机厂家”详细介绍
在线留言

*详情

*联系

*手机

橡胶跑道片材挤出机信息

VIP推荐信息

热门搜索

机械设备>橡塑机械>橡胶跑道片材
信息由发布人自行提供,其真实性、合法性由发布人负责;交易汇款需谨慎,请注意调查核实。
触屏版 电脑版
@2009-2024 京ICP证100626