高频液压打桩机在工作中的安全注意事项:
Safety precautions in the work of pile driver:
1、液压打桩机工作时,要有专人指挥。指挥人员与操作人员在工作前要相互核对信号。工作中应密切配合。
1. When the pile driver works, it should be directed by a special person. Commanders and operators should check each other's signals before working. Close cooperation should be made in the work.
2、开始时,应用电铃或其它方式发出信号,通知周围人员离开。
2. At the beginning, signal should be sent by ringing or other means to inform the people around to leave.
3、打桩机与桩帽,桩帽与管柱(或桩)平面要垫平,联结螺栓应拧紧,并应经常检查是否有松动。
3. Pile driver and pile cap, pile cap and pipe column (or pile) plane should be padded flat, connection bolts should be tightened, and should be checked regularly for loosening.
4、打桩机的启动应由低速档逐档加快到高速。
4. The start-up of pile driver should be accelerated from low-speed gear to high-speed gear.
5、打桩机在工作中应密切注视控制盘上电流、电压的指示情况。若发现异响或其它异常情况,应立即停机检查。
5. Pile driver should pay close attention to the indication of current and voltage on the control disc. If abnormal noise or other abnormal conditions are found, the machine should be stopped immediately for inspection.
6、经常检查轴承温度及轴承盖螺钉是否有松动现象,要严格检查偏心铁块联结螺钉有无松动,防止发生事故。
6. Check the bearing temperature and whether the bolts of the bearing cover are loosened regularly. Strictly check whether the bolts of eccentric iron block are loosened to prevent accidents.
7、下沉时,管柱(或桩)周围严禁站人。
7. When sinking, it is strictly forbidden to stand around the pipe column (or pile).